# Plan production — StockVision › Workshop schedule (FoodEatUp)

Approved orders become production orders, sorted by workshop and by day. A day never goes over 100% of its capacity: beyond that, the software suggests a way to spread the load.

Tutorial page : https://foodeatup.com/en/academy/stockvision/atelier

## What it is for
- See each workshop’s week: production orders and the load of each day.
- Generate orders from the shops’ approved orders.
- Set the workshops, their daily capacity and which dish each one makes.

## Why set it up
- You see an overloaded day before you live it, not during.
- The software never makes the same order twice: running generation again only adds what is missing.
- Every move is logged: you know why an order moved.

## Who is it for?
- Chef de cuisine
- Second de cuisine
- Pâtissier

## Roles with access
- Gérant·e
- Chef de cuisine
- Cuisinier·ère (view)
- Laboratoire (réseau)
- Boutique (réseau)
- Franchisé·e (réseau)
- Directeur·rice d'établissement
- Responsable siège (view)

## Step by step
1. **Open the schedule** — In StockVisionAI, open “Planning d’atelier”. One column per day, one row per workshop, a green, orange or red capacity bar.
2. **Set the workshops** — Tap “Ateliers & routage”: add a workshop (oven, cold…), its daily capacity in units or hours, and pick which workshop makes each head office dish.
3. **Generate the orders** — Tap “Générer” for a delivery day. If a day goes over 100%, nothing is created: the software names the workshop, the day and the rate, and suggests a way to spread the load.
4. **Spread an overload** — Three options: make it the day before when the dish keeps, move an order to the next day with a reason (the shop is told), or open an exceptional slot. Pick one, then the day is generated.
5. **Move or add an order** — Drag an order to another day or workshop, or tap “OF manuel” for stock production. Capacity is checked where it lands.

## The production day is ready
Each order waits in “Fabrication du jour”, with its ingredients and quantity. The team just has to start it.

- **The central kitchen manager** : Sets workshops, generates orders, spreads the load and moves orders.
- **The central kitchen employee** : Sees the schedule if the role allows it. Generating, moving and setting up need the right to edit production.

## Do it with your assistant
### Are my workshops overloaded?
> In FoodEatUp, for my establishment [number], give me the capacity used by my workshops and the orders in production.
What you get : Workshop load and orders in progress.
Tools used : get_lab_hub

### What needs to be made this week?
> In FoodEatUp, for my establishment [number], list this week’s production plans.
What you get : Production plans, day by day.
Tools used : list_production_plans

### What do I need to produce?
> In FoodEatUp, for my establishment [number], give me the ingredients needed for the scheduled production plans.
What you get : The ingredients needed and what is missing.
Tools used : get_production_ingredients

## What you gain
- Never over 100% : An overloaded day is seen before it starts.
- Three ways to spread the load : Bring forward, move with a reason, or open a slot.
- No double production : Running again only adds what is missing.
- A schedule you move by hand : Drag and drop, capacity checked.

## The Chef’s tip
Set each workshop’s capacity with your real team, not an ideal one. When a dish keeps for several days, making it the day before is often the simplest fix.

## What is linked to this screen
- [StockVision › Shop orders](https://foodeatup.com/en/academy/stockvision/labo-reception) : Orders come from approved shop orders.
- [StockVision › Today’s production](https://foodeatup.com/en/academy/stockvision/fabrication) : Each order is started and finished in today’s production.
- [StockVision › Recipe sheets](https://foodeatup.com/en/academy/stockvision/fiches-recette) : Each order’s consumption comes from the dish’s recipe sheet.

## Frequently asked questions
**Why is generation refused?**
A day would go over 100% of a workshop’s capacity. The software suggests a way to spread the load: apply one, then the day is generated.

**What if a shop orders later?**
Run generation again: the existing order is topped up, nothing is made twice.

**Does an order without a recipe sheet work?**
Yes, but its consumption is unknown and the screen says so. For a workshop counted in hours, the time per unit is also needed.